![]() For more information, please contact Community Outreach Specialist Samantha Kayser at 77. 1 from the Citgo Gas Station in front of the Twin Plaza Shopping Center to the first driveway entrance to Bank of America Financial Center will be closed from 8 a.m. 1 to Seacoast Bank Court will be closed from 8 a.m. One northbound lane of SR 76/S Kanner Highway from SR 5/U.S. One eastbound lane of SR 714/SW Monterey Road from the Riverwatch Marina to the WAWA driveway entrance will be closed from 8 a.m. to 4 p.m., as needed, through Tuesday, Feb. One westbound lane of SR 714/SW Monterey Road from the Monterey Shopping Plaza driveway to the European Kitchen and Bath driveway may be closed from 8 a.m. for drainage, utility, sidewalk, and lighting work. 1 will be closed nightly Monday through Friday, through Friday, April 28, from 8 p.m. Two southbound lanes of SR 76/Kanner Highway from the intersection of Monterey Road to SR 5/U.S. 28, for lighting work and milling and resurfacing the roadway. Two northbound outside lanes of SR 76/Kanner Highway from the Monterey Road intersection to SR 5/U.S. 28, for lighting, signalization, and site restoration work. One northbound outside lane of SR 76/Kanner Highway from the parking entrance to Water’s Edge Dermatology south of the Monterrey Road intersection to SE Lonita Street will be closed from 8 a.m. 1 may be closed around the clock through Friday, March 31, for drainage, utility, sidewalk, and lighting work. One southbound outside lane of SR 76/Kanner Highway from the Monterey Road intersection to SR 5/U.S. 1 to access the sidewalk on northbound SR 76/Kanner Highway. Pedestrians are directed to use the signalized crossings at the intersections of SR 714/Monterey Road and SR 5/U.S. 1 and SR 714/Monterey Road is closed through April 2023 to facilitate roadway and drainage work. The sidewalk on southbound SR 76/Kanner Highway between SR 5/U.S. State Road (SR) 76/Kanner Highway Resurfacing Project to 5 a.m., for milling and resurfacing of the roadway. Lucie County line will be closed nightly Sunday, Feb. 1 from NW Jensen Beach Boulevard to the Martin County/St. State Road (SR) 5/US Highway (US) 1 Resurfacing Project During this time, intermittent side street closures may occur, and two-way traffic will be maintained by a flagging operation. One lane in either direction of SR 714/SW Martin Highway from Citrus Boulevard to Martin Downs Boulevard may be closed, Sunday through Thursday, through Thursday, Feb. Cyclists and motorists should share the road. The eastbound and westbound shoulders on SR 714/SW Martin Highway from SW Martin Downs Boulevard to SW Citrus Boulevard are closed through mid-2024 to facilitate widening activities. State Road 714/SW Martin Highway Widening Project Project Development & Environment StudiesĬurrent Construction Lane Closures in Martin County.SR-510/Wabasso Beach Road Bridge Railing Safety Improvements Project.SR A1A and SR 5/US 1 Roadway Improvements Project.State Road (SR) A1A North Causeway Over Intracoastal Waterway (ICWW) Bridge Replacement Project.Fork St Lucie River Bridges Rehabilitation Project State Road (SR) 9/I-95 Northbound and Southbound Off-Ramps at Gatlin Boulevard Roadway Improvements Project.SR 9/I-95 Northbound and Southbound Off-Ramps at Midway Road Improvements Project.State Road (SR) 9/I-95 Weigh In Motion (WIM) Stations Highway Lighting Improvements Project.State Road (SR) 76/Kanner Highway Resurfacing Project.State Road (SR) 5/US Highway (US) 1 Resurfacing Project.SR A1A From NE Shore Village TER To SR-732/Jensen Beach Causeway.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |